Laserfiche WebLink
<br />I <br /> <br />.. -. , -" --, -~.. ._-----'-."---,...--~~--_..._~~-~---,._..._~,..._..~ <br /> <br />) <br />) <br /> <br />) <br />f.) <br />.~ ..'. <br /> <br />feet above its pump, the failure of well A-3 and the potential for failure of well A-2 have threatened the <br />successful operation of providing the water supply for the BORROWER; and <br /> <br />B. Rehabilitation of well A-3 must be completed prior to the spring of 1995 to avoid the possibility of <br />a serious water shortage within the District during the summer of 1995; and <br /> <br />,~ <br /> <br />9. The BORROWER is a duly constituted Colorado special districtfcirmed in 1984pursuant to ~ 32-1-101 <br />et, seq. 13 CRS, located in Douglas County, State of Colorado; and <br /> <br />10. The BORROWER has applied to the STATE for a loan to be used to rehabilitate well A-3 by installing. <br />a new pump. motor. column pipe. power cables. and related appurtenances at a lower depth of approximately <br />1,750feet, hereinafter referred to as the PROJECT; and <br /> <br />11. At its November 4, 1994 meeting, the CWCB determined. pursuant to ~ 37-60-122.6, that the <br />failure of well A-3 does qualify the'BoRRoWER for a loan from the Emergency Account, and approved an <br />emergency loan to the BORROWER in an limountncit to exceed one hundred thousand five hundred dollars <br />($100.500J, hereinafter referred to as MAXIMUM LOAN AMOUNT, and'not to exceed seventy five percent (75%) <br />of the total eligible project construction costs, at an interest rate of five percent (5.0%J per annum, and for a <br />duration of one (1 J year, subject to the execution of a formal contract; and . <br /> <br />12. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained, it is agreed <br />by the parties ss follows: <br /> <br />A. The BORROWER agrees as follows: <br /> <br />1. Construction. Fund Program procedures. The following items are procedures the BORROWER will <br />follow during the construction phase of the PROJECT, <br /> <br />a. Preparation of plans and specifications. The plans and specifications must be approved by the <br />STATE. <br /> <br />b. Bidding. CWCB staff must approve bidding for the PROJECT. The BORROWER may prepare the <br />notice of award and the notice to proceed with construction to the contractor; however, both <br />notices must be approved by the CWCB staff before they.,jre issued. The BORROWER shall conduct <br />a pre-construction conference and the CWCB staff. will have the opportunity to teview and approve <br />the construction schedule. . <br /> <br />c. Performance of work. The BORROWER shall contract for the construction of the work with <br />responsible and capable firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION <br />FIRMS shall be selected by the BORROWER and found acceptable by the STATE before work under this <br />contract begins. <br /> <br />d. As-Built drawings. Upon completion. of the PROJECT, the BORROWER will provide as-built <br />drawings of the PROJECT to the CWCB staff for approval and filing.. . <br /> <br />2, Time for PROJECT completion. The BORROWER shall commence with construction of the PROJECT as <br />soon as practicable to effect completion within six (6) .months of the date of this contract. The PROJECT shall <br />be constructed in accordance with the PROJECT plans and specifications and any modification(s] thereof <br />approved by the STATE, The BORROWER further recognizes that time is of the essence in the performance of all <br />of its obligations under this contract. <br /> <br />3, Indemnification of the STATE. The BORROWER shall require all CONSTRUCTION FIRMS and. their <br />subcontractors to indemnify the STATE and the BORROWER against all liability and loss, and against all claims and <br />actions based upon or arising out of damage or injury, including death, to persons or property, caused by any <br /> <br />CASTLE PINES NORTH METRO DISTRICT <br /> <br />Page20f11 <br /> <br />LOAN CONTRACT <br />