Laserfiche WebLink
EXHIBIT A <br />SCkIEUULF, A <br />COLORADO WATER CONSF:RVA1'ION HOARD <br />CONSTRUCTION FUNU PROGHAM PROCF.DURES <br />1. Boa[d app[oval of enginee[ing ficm and enginee�ing � <br />agceement between engineecing ti�m and p�ojec[ sponso[. <br />2. Prepaca[ion of detailed plans and specifications foc <br />autho[ized p[ojecCS by consul[ing enginee�ing fi�m. <br />3. Approval of detailed plans and specifications by kloacd <br />staEf (plans and specifications foc s[ocage dams and <br />[esecvoics must also be appcoved by Sta[e F.nyineec's <br />office). <br />9. Boacd sta[f app[oval of bidding foc [he p�oject. Boa[d <br />staff pcesent at bid opening foc constcuction. <br />� 5. P[oject sponso[ may issue the notice of awa�d and the <br />noCice [o p[oceed with constcuc[ion to the contcactoe <br />(both no[ices must be appcoved by the Boa[d sta£f beEoce <br />' Chey a[e issued). <br />6. Conduct a p[e-const[uction confecence. Appcoval of <br />constcuctioR schedule by Boa[d staff. <br />�� 7. Constcuction commences. The Boa�d staff makes peciodic <br />� inspections ducing constcuction. All change o[de[s must <br />be app�oved by [he Boacd staff in advance and befo[e any <br />� const[uc[ion on change items can commence. Eme[gency <br />�� i[ems clea�ed by telephone. <br />8. The consultinq enginee� cer.tifies tha[ the p[oject has <br />been completed acco�ding to app[oved dcawings and <br />, specifica[ions and a[[anges fo[ final inspection. <br />' 9. Final inspection and accepCance oE as-built pcojecc by <br />. � -� Boa[d staff. <br />; �. . 10. Submi[tal of as-built d�awings Co Boa�d staf[ f.o� <br />� � �, � � appcoval and filing. <br />EXHIBIT A 1508E <br />