Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER VIII <br /> <br />FINANCIAL PROGRAM <br /> <br />The total improvements needed in Starkville will require <br />a combination of GRANT and loan programs. The total project cost <br />must be paid out of Water User fees and Water Tap fees. The <br />current water user fee is $8.00/month, and no tap fee exists. <br /> <br />An increase of the user charge to $14.00/month would provide <br />$217,720 project as a 50% GRANT and loan for 40 years at 4% <br />interest. This size project would cover the first three priority <br />items with some contingency fund for construction and inflation. <br /> <br />As stated before, the total program will depend on additional <br />grants from HUD, EDA, FmHA and Four Corners Regional.Commissions <br />(FCRC). The 1978 construction, engineering, etc., costs are <br />programmed at $1,074,554. The following Grant program is needed <br />for the total project: <br /> <br />Construction Costs: $1,074,554 <br />Grant Water Conservation Board: <br />Loan Water Conservation Board: <br />Other Grants: <br /> <br />$108,860 <br />$108,860 <br />$856,834 <br /> <br />100% HUD - CD <br />100% EDA LPW II <br />Other <br /> <br />$250,000 <br />$400,000 <br />$206,834 <br /> <br />- <br />;;;; <br /> <br />The payout schedule for the loan of $108,860 is shown in <br />the following table. In this table, a $14.00 per month user <br />fee for 52 users is the base revenue. A fee increase on basis <br />of 52 users will be needed in the 15th, 20th, 25th, 30th, 31st, <br />36th and 38th year of loan repayment in the amounts of $1, $2, <br />$3, $3, $3, $3, and $4 dollars respectively. An offset on this <br />increase would be added users by population growth and/or invest- <br />ment of surplus funds into savings account or other high interest <br />short-term funding. <br /> <br />34 <br /> <br />--- <br />