Laserfiche WebLink
<br />Summarizing the costs in terms of alternate treatment sites <br />and with and without South Starkvi11e and Greekvi11e: <br /> <br /> Collection Treatment Total <br />Starkville Only Site 2 119,640 90,000 209,640 <br />Starkville Only Site 3 135,840 90,000 225,840 <br />Starleville Only Site 1 179,040 90,000 269,040 <br />Starkville plus the South Starkville area would increase the <br />collection costs on each site by $62,040 and the treatment costs <br />would be essentially the same. <br /> <br />The total of Starkvi11e, South Starkvi11e and Greekvi11e limits <br />site selection Site No. 1 with costs of: <br /> <br />Collection <br /> <br />Treatment <br /> <br />Total <br /> <br />$292,000 <br /> <br />$90,000 <br /> <br />$382,000 <br /> <br />Adding 25% contingencies, engineering, legal, etc., gives the <br />total project costs as follows: <br /> <br />Construction <br />Costs <br /> <br />Total <br />Proj ect <br />Costs <br /> <br />Cost/ <br />User <br /> <br />Starkvi11e, South <br />Starkville, <br />Greekvi11e Site 1 <br /> <br />$382,000 <br /> <br />$477,500 <br /> <br />$4,340 <br /> <br />(42) <br /> <br />- 12 - <br />