My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150037 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150037 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2010 2:51:06 PM
Creation date
10/5/2006 11:36:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150037
Contractor Name
Alamosa River Watershed Restoration Foundation, Inc.
Contract Type
Grant
Water District
35
County
Alamosa
Bill Number
HB00-1419
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />: <br /> <br />CWCB Construction Fund Loan Application <br /> <br />FQnn Revised March 4, 1998 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. (please submit one copy of each completed study with this <br />application): <br />MaYldfme n+-2W{) 1O.-rh.. 4fa mo'3o. /l../odr wah:sbed <br />R,'pOJi'On (}Y(rl'drJr fl~seS5(A/vCr- ,4/af11t1L'%\ tii(fl <br />~amp;u nd fJ(1tU!c",:, Nfl II - flla filM. Jlt (J,!fI,jr7 Jbil&. <br />C(lr7(!~ J):st7f7 r 'fhL- /J!4~ /!.;'i/er- <br /> <br />9. What is the estimated cost of the project? Please include estimated Engineering costs, and <br />estimated Construction costs, ifknown: <br />Estimated Engineering Costs: $ 1i;/}!jJi Q . <br />Estimated Construction Costs: $/0!1) ;){)b <br />Estimated Total Costs: $ :J/I-?:J, 7d..O <br /> <br />10. What loan amount and terms are you requesting? (please call for our current rates before <br />completing this section): <br /> <br />Requested Loan Amount: <br />Term (length) of/oan: <br />Interest Rate: <br /> <br />$ <br /> <br />(Usually 75'%ofEstima1ed Total Cost<;) <br /> <br />years CU",alIy 10, 20, or 30 y,,,,) <br />% <br /> <br />Part C. - Project Sponsor Financial Infonnation <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />requested to assist the CWCB in a preliminaIy assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br />reports, financial statements, corporate reports or other current documentation of financial condition <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.