<br />Estimated cost of the project is $68,970. Some ECP money <br />was allotted to this project but this should be committed by <br />December 15th. <br /> <br />2 . LOCATION <br /> <br />This structure is located along the southeast bank of the <br />South Platte River in the SE 1/4 of section 12, T 8 N, R 52 <br />W, 6th P.M. This is about 2 1/2 miles south of Ford. <br />Elevation = 3890 ft above sea level. <br />Structure is adjacent to a county road so access is fairly <br />good. <br />Hazard classification of the project would be (a). <br /> <br />3 . COOPERATORS: <br /> <br />As mentioned earlier, there are 11 cooperators. I have been <br />contacted by Bob Dickinsen who is the secretary of the ditch <br />company. <br /> <br />5. ALTERNATIVES CONSIDERED: <br /> <br />If this structure isn't replaced, <br />to pump water up into the ditch. <br />expensive. <br /> <br />the alternative would be <br />This would be quite <br /> <br />Cooperators may consider swapping <br />permits if feasible and allowable <br />solution for everyone. <br /> <br />ditch shares for well <br />but this isn't the best <br /> <br />6. COST AND ECONOMIC FEASIBILITY OF THE PROJECT <br /> <br />Earthwork in river bed- <br /> <br />50 hrs @ $100 / hour <br /> <br /> $5000 <br /> $15,000 <br /> $19,800 <br /> $20,300 <br /> $600 <br /> $2,000 <br />$ 62,700 <br /> $ 6,270 <br /> $68,970 <br /> <br />Dewatering site <br /> <br />Sheet piling in river bed- 1200 sq ft x $16.50 <br /> <br />Reinforced concrete 40.6 cy x $500 <br /> <br />Pressure grouting 5 cy x $120 <br /> <br />Structure removal <br /> <br />sub total <br /> <br />10% contingencies <br />Total <br /> <br />7. ESTIMATED STAFF-HOURS OF NRCS TIME REQUIRED <br /> <br />