<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Three criteria were used in the Plan Elements evaluation process: <br /> <br />o Yield - The yield is defined for this study as the amount of deficit <br />reduction attainable through implementation of the Plan Element. <br />The yield was computed at the 100-year recurrence interval for the <br />demand rate and supply sources specified in the Design Conditions. <br />Yields are expressed to the nearest AF to facilitate comparison <br />between Plan Elements. <br /> <br />o Cost - The total capitalized cost of each Plan Element was computed <br />based on 1987 equivalent dollars. Costs considered include land <br />acquisition, design, construction, engineering, and operation and <br />maintenance costs. All cost estimates are shown to three <br />significant figures. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />o Social/Environmental Factors - The impact of each Plan Element in <br />relation to social and environmental issues was identified. Issues <br />considered included changes in land use; changes in ingress and <br />egress; and effects on vegetation, wildlife, and fisheries. <br /> <br />Each of the 12 Plan Elements were first evaluated in terms of their ability <br />to reduce or eliminate the Design Condition deficit of 2,745 AF at the 100- <br />year recurrence interval. All Plan Elements, except for the development of <br />ground water resources, were evaluated utilizing the Phase II computer <br />models. Table 4-1 summarizes the results of each Plan Element with respect <br />to deficit reduction and estimated cost of implementation. <br /> <br />I <br />I <br /> <br />Estimated costs shown in Table 4-1 consist of capital (engineering, legal, <br /> <br /> <br />construction, purchase) and annual (operation and maintenance, assessments) <br /> <br /> <br />costs. Total costs were computed by converting annual costs to capital <br /> <br /> <br />costs assuming a 10 percent interest rate over 20 years and adding the <br /> <br /> <br />result to the capital cost. The total cost was then divided by the deficit <br /> <br /> <br />reduction estimated for the Plan Element to provide a direct cost <br /> <br /> <br />comparison between Plan Elements on a dollar per AF of reduction basis. <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Due to the demand projected under the Design Conditions, additional raw <br /> <br /> <br />water treatment capacity will be required for all Plan Elements (except <br /> <br /> <br />water conservation). The cost of treatment expansion has not been included <br /> <br /> <br />in the individual Plan Element cost estimates since these costs are <br /> <br />4-2 <br /> <br />I <br />