Laserfiche WebLink
<br />---~-~------------- <br /> <br />TABLE 3 <br /> <br />PLAN ELEMENT DEFICIT REDUCTIONS AND COSTS <br />100-YEAR DESIGN CONDITION DEFICIT = 2,745 AF <br /> <br />Implementation Costs <br />(1987 Dollars) <br /> <br />Plan Element <br /> <br />Level of Implementation <br /> <br />Defici t <br />Reduction <br />(AF) <br /> <br />Capital Cost <br /> <br />Annuall <br />O&M Cost <br /> <br /> Yater Conservation <br /> - Minimal 2.9%-3.9% demand reduction 614 NA NA <br /> - Moderate 2.9%-4.9% demand reduction 729 NA NA <br /> - Aggressive 5.2%-7.1% demand reduction 1,178 NA NA <br /> New Yater Right Diverts up to 2,100 AFY 50 25,000 0 <br />., Expand Green Ridge Glade Reservoir 5,050 AF 2,745 10,BOO,000b 52,000 <br />" <br />, Construct Maitland Reservoir 4,950 AF 2,745 75,000 <br /> 21,400,000 <br /> (with 600 AF at G.R.G.) <br /> Additional CBT 7,145 units (20,600 total) 2,745 a 73,200 <br /> 5,720,000 <br /> Additional Yindy Gap 55 units (95 total) 136 12,300,000 5,730 <br /> Additional Direct Flow <br /> - No. 1 Yater 21.4 CFS add'l 2,286 a 0 <br /> 4,420,000 <br /> - No. 2 Yater 14.4 CFS add'l 346 a 0 <br /> 1,660,000 <br /> - Big Thompson Ditch 7.5 CFS add'l 146 314,000a 0 <br /> - South Side Ditch 1. 1 CFS add' I 4 12,600a 0 <br /> Yindy Gap Reuse No Defici t Reduction <br /> Stored Transfer Decree Yater Exchange with No. 1 water or 336 25,000-50,000 0 <br /> CBT water <br /> Ground Yater No Defici t Reduction <br /> Municipal-Agricultural Lease Lease ditch company water 2,286 100,000 218,000 <br /> Agreement as-needed <br /> Revised Operating Policy City storage prior to 65 0 0 <br /> CBT/Yindy Gap <br /> <br />a Estimate based on current cost of CBT water - $800/unit = $1,143/AF. <br />b Costs were estimated for a roller compacted concrete dam to facilitate expansion if necessary at a later <br />date. <br />