My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00102
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:35:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FU'ln6."C-02A <br /> <br />'-i <br /> <br />EXHIBIT A <br /> <br />I~ \ <br />DEI'A ENT OR AGENCY NUMBER <br />34-04-00 <br />CONTRACf ROUTING NUMBER <br /> <br />TERMI NATION <br />CONTRACT <br /> <br />No encumbrance <br /> <br />THIS CONTRACT. made this 15th day of Angll~t- <br />Statt of Colorado for the use and benefit of the Departmeru of '1 <br />(Colorado Water Conservation Board), <br />hereinafter referred to IS the Stl'tte, and '2 Fuchs Ranches, Inc., <br />1620 County Rd. 14A, Del Norte, CO 81132, <br />hereinafter referred to lis the col1tractor, <br /> <br />1985, by and between the <br />Natural ResourCes <br /> <br />IfH~XlllkIlllllKJrn~IO>>k~~lI1lIJ@JII!IlIM"l(tJfIlK~Jll!Pgl!1K!IIlooll:l9lI\l!II'M:JlIltli.< <br />~~ltxXQ(II<ll1l\lKJ(llfl!WX1ll<<~l!JI!l!XIlmlIk~!l1pj~~JII!r_~!l:fllmIlml(Xl(l(l()(, <br />JIl/k_)(I)ll!llllnll<<1(XXXXY,x<l0Ill'lfl{OOI)!\oo{p:~xPll'l <br /> <br />WHEREAS. required approval. clearance and coordination hiS been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS, the State and the Contractor entered into a <br />COtltract on September 1, 1981 (attached as Exhibit B anct <br />incorporated by reference herein, which contract shall <br />het'einafter be referred to as the "feasibility report contract," <br />in which the State agreed to pay the Contractor Four Thousand Two <br />HUndred Dollars ($4,200) for the purpose of partially funding a <br />feasibility report concerning the repairs of Fuchs dam; and <br /> <br />WHEREAS, the teasibility report contract provided in part <br />the following termS: <br /> <br />5. In co~sidetation of the State assuming a portion <br />of the cost of the preparation of the said project <br />feasibility r@port. the Contructor shall pay to the State <br />the sum of r'ive Thousand Four Hundred Thirty-Nine Dollars <br />(';;5,439) prov:lded that const-ruction of the subject water. <br />project is in:ltiat~d within ten (10) years of the date of <br />this contract. Th~ Contractor shall fulfill this Obligation <br />irrespective pi how, or by whom, the subject water project <br />is financed o~ paiq for so long as construction is initiated <br />within the sp~cifi~d time. <br /> <br />6. tn the event the Conttactor must make payment <br />pursuant to t~e te~ms of paragraph 5 above, then the said <br />sum ot ~ive 1'pousand Four Hundred Thirty-Nine Doll~rs <br />($5,439) shal> be payable in ten (10) equal installments of <br />Five Hundred fortY-Three Dollars and Ninety Cents ($543.90) <br />each, the fir~t installment to be due and payable ~pon the <br />January 1st next s~cceeding the initiation of construction <br />on the said w~ter ~roject. SUbsequent payments shall be due <br />and payable o~ JanUary 1st of each year thereafter; and <br /> <br />WHEREAS, the Gtate and the Contractor intend to enter into a <br />contract (hereinafter referred to (lS the "project contract") in <br />which the State will loan the Cont~actor money for the purpose of <br />repairing the FuchS dam; and <br /> <br />WHEREAS, initiation of construction to repair the Fuchs dam <br />would create ~n obligation on the part of the Contractor to make <br />payments unde:t the terma, specificCilly paragra.ph Nos, 5 and 6, of <br />the existing feasibility report contract; and <br /> <br />WHEREAS, the parties agree thCit it would be mutually <br />beneDicial to terminate the Contra~tor's obli9ation under the <br />feasipility r~port contract and to integrate ~epayment of the <br />E'o~r Thousand Two l-Jundred Dollars ($4,200) (wnich represents the <br />principal amOUnt provided by the State for the purpose of <br />partially funQing the feasibility ~eport for the Fuchs dam <br />project) with the Contractor's repayment of tDe loan which will <br />be made purSUant to the project contract; <br /> <br />EXHIBIT A <br /> <br />395-S3.Ql-COlO <br /> <br />4 <br />Page I of_pages <br />*ISee instructions on reverse or luc pale.) <br /> <br />103 <br />fuchs / d <br />
The URL can be used to link to this page
Your browser does not support the video tag.