My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00102
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:35:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />shall be made available to the Borrower in accordance with the <br /> <br />following <br /> <br />terms and conditions: <br />L <br />a. -Beginning with the monthly period commencing <br />August 18, 1985. and for every month thereafter until <br />said project has been completed, the Borrower shall <br />prepare, with the assistance of the engineering firm <br />referred to in paragraph A.I. above, an estimate of <br />the funds required from the State for project <br />construction during that month and shall forward sa~d <br />estimate to the State not less than fifteen (15) days <br />prior to the beginning of such month. <br /> <br />, <br />) <br />i <br /> <br />b. Upon receipt and approval by the State of such <br />monthly estimate, the State will, within forty (40) <br />days from the receipt of such estimate, pay over to <br />the Borrower the amount of the monthly estimate <br />or such portion thereof as has been approved <br />by the State, <br /> <br />c. No payments will be made under this contract <br />until the project plans and specifications referred <br />to in paragraph A.I. above are approved by the State. <br /> <br />2. Provide the Borrower with such technical assistance as <br />the State deems appropriate in planning, constructing. and <br />operating the project and in coordinating the project with <br />local official comprehensive plans for sewer and water and with <br />any State or area plans for the area in which the project is <br />located. <br /> <br />D. This contract is not assignable by the Borrower except <br />with written approval of the State. <br /> <br />E. The parties to this contract intend that the relationship <br />between them contemplated by this contract is that of <br />lender-borrower. not employer-employee. No agent, employee, or <br />servant of the Borrower shall be or shall be deemed to be an <br />employee, agent, or servant of the State. The Borrower will be <br />solely and entirely responsible for its acts and the acts of <br />its agents, employees, servants, engineering firms, <br />Construction Firms, and subcontractors during the performance <br />of this contract. <br /> <br />F. At all times during the performance of this contract, the <br />Borrower shall strictly adhere to all applicable federal and <br />state. laws that have been or may hereafter be established. <br /> <br />G. This agreement is intended as the complete integration of <br />all understandings between the parties. No prior or <br />contemporaneous addition, deletion, or other amendment hereto <br />shall have any force or effect whatsoever unless embodied <br />herein in writing. No subsequent novation, renewal, addition, <br />deletion, or other amendment hereto shall have any force or <br />effect unless embodied in a written contract executed and <br />approved pursuant to the State fiscal rules. <br /> <br />H. In its sole discretion, the State may at any time give any <br />consent, deferment, subordination, release, satisfaction, or <br />termination of any or all of the Borrower's obligations under <br />this agreement, with or without valuable consideration, upon <br />such terms and conditions as the State may determine to be (a) <br />advisable to further the purposes of this contract or to <br />protect the State's financial interest therein, and (b) <br />consistent with both the statutory purposes of this contract <br />and the limitations of the statutory authority under which it <br />is made. <br /> <br />I. Upon completion of the repayment to the State in the sum <br />of One Hundred Seventeen Thousand Five Hundred Sixty-Five <br />Dollars ($117,565), as set forth in paragraph A.Il. of this <br /> <br />Page 5 of 8 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.