Laserfiche WebLink
<br />Form 6-AC-02A (R S/8S) <br />I;jPB <br /> <br />If c oLl / :;, "{U <br />.TMI::N'r OR AGENCY .....L!MBtR . <br />34-04-00 <br />CONTRACT RO~~ING l'nJMBfR <br />,>rei/f; <br />No Additional Encumbrance <br /> <br />AMENDMENT #l <br /> <br />PROJECT <br /> <br />CONTRACT <br /> <br /> <br />THIS CONTRACT. madt' this ./...l-/ day of ~r ~ /4 <br /> <br />Statt' of Colorado for tht' use al1d benefit of the Department of . 1 <br />(Colorado Water Conservation Board) , <br /> <br />ht'reinaher I'f'ferred to as the State, and'2 the Blue Hi ver Water <br />P. O. Box 2479, Breckenridae, CO 80424. <br /> <br />IJereinafler referred 10 as the cOl1lraClor./Contractor. <br /> <br />NFl +11 rFl1 <br /> <br />198 fL. . by and between the <br />t{eRfHlrces <br /> <br />DiRtrict <br /> <br />WHEREAS. authorily exists in the Law and Funds have bt'cn budgeted, appropriated and otherwise made <br />.avail..ble and a sufficient unencul1lbered b..lance lhercof remains available for paymenl in Fund ~umber 4008 <br />G/L Account Number 5353X. Contract Encumbrance NumberCl5335l : jlnd <br />ABL Account No. 13530, Org. Unit 77-77-777, <br />WHEREAS. rC4uired appwv..i. clearance and coordination oas been accomplished from and wilh OIpproprialc <br />agencies: and <br /> <br />WHEREAS. a contract was entered into on July 15. 19B1, <br />between the State and the Contractor (hereinafter the "original <br />contractU) for the Blue River Water District project; and <br /> <br />WHEREAS, the state desires to extend the time of completion <br />of the project; and <br /> <br />WHEREAS. parag~aph A.2. of the original contract provides <br />for extension of time if such time "is insufficient because of <br />circumstances beyo~d the control of the Contractor; and <br /> <br />WHEREAS, the contractor could not complete the second phase <br />of the project bec~use of lack of matching funds: and <br /> <br />WHEREAS. the contractor is now ready to proceed with the <br />second phase of thls project; and <br /> <br />WHEREAS. <br />designed the <br />and <br /> <br />the contractor has proceeded on his own and <br />seconQ phase of this project with his own moneys; <br />-" <br /> <br />WHEREAS, the State has approved the submitted contract <br />documents; and <br /> <br />WHEREAS, the Contractor has sufficient matChing funds to <br />match the State moneys. . <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. This contract amendment is supplementsl to the original <br />contract (EXhibit A). which is by this reference incorporated <br />and made part hereof. All terms, conditions, and provisions of <br />the original contract unless specifically"amended herein shall <br />remain in full force and effect. <br /> <br />2. The original contract shall be amended as follows: <br /> <br />a. In paragraph A.2., third line, st:cike "two (2)" and <br />insert in lieu thereof llten (10\. <br /> <br />b. In paragr~ph A.5.. insert nine ne~ paragraphs which <br />will read as folfows: <br /> <br />g. One adsorption clarifier 88 to 263 gal./min. <br />capacity. CPC Micro Ploc, model AC-17. <br /> <br />h. One Hach turbidimeter. ~odel 1720C. <br /> <br />i. One Hach-Chessell recorder, model 300. <br /> <br />B033E <br /> <br />395-:5lGl-1O"W <br /> <br />Page I of~pa~es <br />