My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00100
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:35:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153496
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Paqe <br /> <br />Letter of Transmittal <br />Resolution of the North poudre Irrigation Co. <br />Table of Contents (including list of maps & exhibits) <br />Project Summary <br /> <br />i <br />ii <br />iii, iv <br />v-ix <br /> <br />Chapter I: <br />A. <br />B. <br />C. <br /> <br />General Information <br />Project Map <br />Location <br />Climate <br /> <br />1 <br />1 <br />1-3 <br /> <br />Chapter II: The North Poudre Irrigation Company <br />A. History of Organization 1 <br />B. Laws Under Which Organized 1 <br />C. Powers and Authorities of Organization 1,2 <br />D. Financial Status 2,3 <br />E. Physical Assets 3 <br />Chapter III: Land <br />A. Land Classification 1,2 <br />B. Service Area Map 2 <br />C. Land Use 3-5 <br />D. Land Ownership 5 <br />Chapter IV: Water <br />A. Water Rights 1,2 <br />B. Water Utilization 2-4 <br />C. Water Quality 4,5 <br />Chapter V: Plan of Development <br />A. Physical Plan 1-4 <br />B. Geologic Investigations 4 <br />C. Design 4,5 <br />D. Structure Plans 5-9 <br />E. Drainage 9,10 <br />F. Sedimentation 10,11 <br />G. Right-of-Way 11,12 <br />Chapter VI: Estimated Costs <br />A. Costs of Construction 1-5 <br />B. Fund Requirement Schedule 5 <br />Chapter VII: Project Evaluation 1-8 <br />Chapter VIII: Financial Program 1,2 <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.