Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Construction Fund Loan Application <br /> <br />Forni RuJsed March 4, 1998 <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO MA <br /> <br />4. General location of the project. (Please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known): APPROX. 4 MILES <br />NORTH OF ERIE IN WELD COUNTY. NW CORNER SW4 SEC 31 T2N 68w 6P~ <br /> <br />WELD COUNTY <br />5. Please provide a brief narrative description of the proposed project including purpose, <br />need, facilities, types of water uses to be served and service area. (Attach separate sheet, <br />if needed.): OUR RIVER DIVERSION HAS DETERIORATED OVER THE YEARS <br />AND WILL FAIL UNLESS REHABILITATION OF THE STRUCTURE IS <br /> <br />ACCOMPLISHED SOON <br /> <br />Water Right 7. 24 CFS. Average water diverted per year 227 R Acre-feet. <br />23.20 DIVERSION RECORDS ATTACHED <br />30.44 <br />6. Will the acquisition of additional water rights be necessary? <br /> <br />YES NO x . If "YES", please explain: <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained 10 <br />represent the applicant or to conduct investigations for the proposed project: <br />NAME ADDRESS and PHONE <br /> <br />GLENN NEULON <br /> <br />NPCS - GREELEY OFFICE - 970-330-0380 <br /> <br />3 <br />