<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Project Description and Alternatives <br /> <br />The purpose of this project is to provide a means for the PDDC to continue providing irrigation <br />water to shareholders while minimizing the possibility of a future failure of their diversion <br />structure. Three alternatives were considered: <br /> <br />1, The no-action alternative, <br />2, Rehabilitation of the diversion only. <br />3. Rehabilitation of the diversion and the headgate structure, <br /> <br />Alternative No.1, no-action, was considered unacceptable since it means the PDDC may not <br />be able to deliver water to its shareholders in the future. <br /> <br />Alternative No.2, rehabilitation of the diversion only, was selected, since it is considered to be <br />the least costly reliable approach. <br /> <br />Alternative No.3, rehabilitation of the diversion and the headgate structure. was ruled out <br />because of the additional cost, and because the head gate is in generally good condition, <br /> <br />The selected alternative, Alternative No.2, involves construction of a 225 cubic-yard grouted <br />rock riprap diversion dam, and rebuilding the 48-foot steel check structure. <br /> <br />The Greeley Office of the Natural Resources Conservation Service (NRCS) has prepared <br />preliminary engineering designs and a cost estimate for the project. The plans and cost estimate <br />are included in Appendix D, The estimated cost of the completed project is $46,620, The cost <br />breakdown is summarized in Table 1. <br /> <br />Table 1. Plumb and Dailey Ditch Company - Diversion Structure Project - Cost Estimate <br /> <br /> Item Quantity Unit Unit Price $ Amount $ <br />Dewatering 1 Job 7.000 7,000 <br />Concrete, Reinforced 11,5 c.y, 950 10,925 <br />Rock riprap 225 Ton 35 7,875 <br />Grout 40 C,Y, 150 6,000 <br />Metalwork 1 Job 4,500 4,500 <br />Engineering Design and Supervision 1 Job 4,620 4,620 <br />Contingency at 15% 1 Job 5,700 5,700 <br /> Total . $46,620 <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by mid summer 2000, Construction will take <br />about 30 days, and will be completed in fall 2000, <br /> <br />Plumb and Dailey Ditch Company <br />Diversion Structure Feasibility Study <br />May 2000 <br /> <br />Page 9 of 12 <br />