My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00098
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153140
Contractor Name
Fruita, City of
Contract Type
Grant
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:'. <br /> <br />. <br /> <br />A concensus that the recommended plan is the most desirable plan <br />is needed here. The next, and final, step in the schedule is <br />reproduction of the feasibility study and its results. <br /> <br />Decision Point 4: This will be the pOint for a decision to adopt <br />and implement the recommended plan. <br /> <br />The present work load of our firm is such that we can begin work on your project <br />promptly upon award of the project. We will strive to meet your suggested <br />August 1 completion time although it is recognized that some of the time <br />considerations are beyond our control. An early starting time is also important <br />from the standpoint of being able to assess the watershed area during a major <br />portion of the runoff period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.