Laserfiche WebLink
<br /> COS'T ESTlrlATE #2 <br /> FOR <br /> HARPER lAKE & lOUISVlllE RESERVOIR <br /> FEASIBiliTY STUDY <br /> ESTIMATE OF TIME REQUIRED (MAN-HOURS) <br /> Principal <br /> of the Project Design <br /> DESCRIPTION Fi rm Eng i neer Engineer Drafting Surveyrng Secretary <br /> Prefacing Material 6 3 <br /> Chapter I - General Information 8 24 2 <br /> Chapter II - City of louisville 8 10 6 <br /> Chapter II I - Louisville Planning Area 8 12 12 <br /> Chapter IV - Louisville Water Rights 2- <br /> A. Requirements 8 8 6 <br /> 8. Surface Water Supply vs. Demand 4 10 16 2 <br /> C. Water Rights 2 44 72 6 <br /> Chapter V - Plan of Development louisville Reservoir <br /> A. Physical Plan 8 12 12 24 64 2 <br /> B. Geologic I nves t i ga t ion s 1, 8 12 12 2 <br /> C. Design 6 27 60 40 16 <br />-.) Chapter VI - Plan of Development Harper lake <br /> A. Physical Plan 8 12 12 24 64 2 <br /> 8. Geologic Invest igat ions!' 8 12 12 2 <br /> C. Design 6 16 60 40 16 <br /> Chapter VI I - Estimated Costs <br /> A. Costs of Construction 4 4 12 <br /> B. Fund Requirement Schedule 4 4 6 <br /> C. Operation. Maintenance & Replacement 4 4 ~. <br /> D. Emergency Operating Fund 4 <br /> Chapter V III - Project Evaluation 16 4 4 3 <br /> Chapter IX - Financial Program 8 12 12 12 <br /> Final Typing and Reproduction 64 <br /> TOTALS 67, 215 266 176 , 26 \76 <br /> Hour I y Rates: $55 $ ...l.L $26.75 $18.25 $56.25 $20 <br /> Costs: $4.765 $7.525 $6.280 $3.212 $7.200 $3.560 <br /> TOTAL COST: $34.562.00 <br /> "See Append i x 1 <br />