My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00092
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:35:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153412
Contractor Name
Louisville, City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />42 <br /> <br />COST EST II.iATE #2' <br />FOR <br />HARPER lAKE & LOUISVilLE RESERVOIR <br />FEASIBILITY STUOY <br /> <br />ESTIHATE OF TIHE REQUIREO (HAN-HOURS) <br /> <br />OESCRIPTlON <br /> <br />Principal <br />of the <br />Fi rm <br /> <br />Prefacing Material <br />Chapter I - Genera 1 lnformat ion <br />Chapter II. City of Louisyille <br />Chapter III - Louisville Planning Area <br />Chapter IV - Louisville Water Rights <br />A. Requirements 8 <br />B. Surface Water Supply vs. Demand 4 <br />C. Water Rights 2 <br />Chapter V - Plan of Development Louisville Reservoir <br />A. Physical Plan 8 <br />B. Geologie Investigations* 8 <br />c. Design B <br />J Chapter VI : Plan of Development Harper Lake <br />A. PhYSical Plan 8 <br />B. GeOlogic Investigations* 8 <br />c. Design 8 <br />Chapter V II - Est imated Costs <br />A. Costs of Construction <br />B. Fund Requirement Schedule <br />C. Operation. Maintenance & Replacement <br />O. Emergency Operating Fund <br />Chapter VIII - Project Evaluation 16 <br />Chapter IX - Financial Program 8 <br />Final Typing and Reproduction <br /> <br />TOTALS <br /> <br />Hourly Rates: <br />CoSts: <br /> <br />Sf <br />$55 <br />$4.785 <br /> <br />TOTAL COST: $34.5&2.00 <br /> <br />*See Appendix I <br /> <br />Project Design <br />Enq i neer Engineer <br />& <br />8 <br />8 10 <br />8 12 <br />8 & <br />10 16 <br />44 72 <br />12 12 <br />12 <br />27 60 <br />12 12 <br />12 <br />16 60 <br />4 4 <br />4 4 <br />4 4 <br />4 <br />4 4 <br />12 12 <br />215 288 <br />$ ..lL $28.75 <br />$7.525 $8.280 <br /> <br />Draft ing <br /> <br />Surveying Secretary <br /> <br />24 <br /> <br />3 <br />2 <br />6 <br />12 <br /> <br />2 <br />2 <br />6 <br /> <br />24 <br />12 <br />40 <br /> <br />24 <br />12 <br />40 <br /> <br />64 <br /> <br />2 <br />2 <br />16 <br /> <br />64 <br /> <br />2 <br />2 <br />16 <br /> <br />12 <br />6 <br />6 <br />2 <br />3 <br />12 <br />64 <br /> <br />176 <br />$18.25 <br />$3.212 <br /> <br />128 <br />$56.25 <br />$7.200 <br /> <br />178 <br />$20 <br />$3.560 <br />
The URL can be used to link to this page
Your browser does not support the video tag.