My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00092
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:35:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153412
Contractor Name
Louisville, City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />G. <br /> <br />40 <br /> <br />4. Structure PlanS <br /> <br />A description of proposed major structures and <br />typical minor structures. <br /> <br />a. Profile and typical sections of canals, giving <br />dimensions, hydraulic properties and water <br />surface or hydraulic gradeline elevations. <br /> <br />b. Layout and sections of each major structure and <br />typical minor structures, showing important dimen- <br />sions and hydraulic properties. <br /> <br />5. Drainage <br /> <br />A description of any present or anticipated drain- <br />age problems and plans for their correction. <br /> <br />6. Sedimentation <br /> <br />A description of effect suspended solids and bed- <br />load may have on project facilities and what provisions <br />will be made to minimize the effects. Also, estimate <br />of sediment storage required and determination of ele- <br />vation of reservoir outlet. <br /> <br />7. Right-of-Way <br /> <br />A discussion of right-of-way requirements; right- <br />of-way available; and if additional right-of-way is <br />required; proposals for such acquisition. <br /> <br />,Estimated Costs <br /> <br />1. Costs of Construction <br /> <br />The chapter will include: <br /> <br />a. Derivation of unit construction costs and <br />pertinent factors affecting estimated <br />construction costs. <br /> <br />b. A tabulation showing the quantities, unit <br />cost, and total cost of each type of work <br />or material for each major structure and each <br />class of minor structures. <br /> <br />c. A summary of estimated project costs. <br /> <br />d. The allowance for contingencies that was <br />included in the cost estimate. <br /> <br />fE')OC1~ <br />b~Hj\JU\w <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.