My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00089
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2010 3:20:46 PM
Creation date
10/5/2006 11:35:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153682
Contractor Name
Caryl R. Carroll
Contract Type
Loan
Water District
43
County
Rio Blanco
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'] <br /> <br />) . . <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />.721 State Cent~nnial Building <br />1313 Shemlan Stre-.et <br />Denver, 'Colorado 80203 <br />Pboot (303) 866,3441 <br />F,\X (303) 8664474 <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Ex.ecutive Director, DNR <br /> <br />August L 1995 <br /> <br />. Daries C. Lite, P.E. <br />Director, eweB <br /> <br />Mrs, Parna Etchart <br />69116 Highway 64 <br />Meeker, Colorado 81641 <br /> <br />Re: DD&E Wise Dam Rehabilitation Project <br />~~' <br /> <br />Dear Mrs, Etchart: <br /> <br />It is. a pleasure to inform you that the Colorado Water Conservation Board (CWCB), at <br />its July 25 Board meeting, approved a $25,000 loan from the CWCB Small Project Loan Account <br />for the additional costs associated with the construction of the above referenced project. <br /> <br />Terms of the loan are 3,75% interest for 20 years, These terms were established by the <br />CWCB for all current loans initiated in 1995, Tl1e terms of your original loan, $50,000 at 2,0% <br />for 20 years remains unchanged, <br /> <br />. Mrs, Jan Illian of this office will be preparing a contract amendment to the original <br />Contract #C-153683 dated August 22, 1994, She will be contacting you in the near future to <br />coordinate the specific details, <br /> <br />Mr, Mike Serlet will continue to provide construction engineering and project <br />administration services for the project and will administer the loan advances and project <br />inspections, . <br /> <br />If you have any questions regarding this matter please refer them to either Mike or Jan <br />at 1-303-866-3441. <br /> <br />Sincerely, <br /> <br />~?~~ <br /> <br />William p, Stanton, P,E, <br />Chief, Project Planning and Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.