My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153445 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153445 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:57 AM
Creation date
10/5/2006 11:35:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153445
Contractor Name
Summit Reservoir and Irrigation Company
Contract Type
Loan
Water District
32
County
Montezuma
Bill Number
HB 84-1128
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A ,range of soils data was evaluated utilizing the results <br />from the triaxial tests. The results showed that the embankment <br />and foundation are stable, with respect to sliding, in the present <br />condition, <br /> <br />There is still the possibility of failure by piping of water <br />and fines through the embankment or foundation, however. The <br />filter material is designed to preclude this possibility. <br /> <br />Further analysis and evaluation of the middle south dike <br />'filter, preparatory to construction, may show that the thickness <br />and areal extent of the berm and filter could be reduced. The <br />potential reduction will depend on .identification of the major <br />seepage areas in the area, all of which should' be covered with the <br />filter material. <br /> <br />-30- <br />
The URL can be used to link to this page
Your browser does not support the video tag.