My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00084
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:35:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150139
Contractor Name
Coal Creek
Contract Type
Loan
Water District
0
County
Fremont
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FROM Town of Coal Creek <br /> <br />PHONE NO. 719 784 6150 <br /> <br />Jan. 16 2003 11:51~M P4 <br /> <br />CWCB Construction Fund LOl\D Application <br /> <br />inadequate in dry years like 1977, 1.978 & 2002. This water right cannot by itself provide for all of <br />the Town's present water requirements during such dry years. The Union Ditch rights carry an 1863 <br />Arkansas River priority. Per Attachment #2, Martin & Wood Water Consultants recommend <br />acquiring 100 shares to meet current demands. These warer shares acquisition will be used for <br />municipal purposes. '27 'l.. C>~ tlulOf,/ I~ CU. <br /> <br />CFS. <br /> <br />Average water diverted per year; <br /> <br />Wb <br /> <br />acre-feet. -'7'Ztp'/ <br /> <br />Water Right: <br /> <br />6. Will the acquisition of additional water rights be neCessary? YES X NO <br /> <br />If YES, please explain. <br /> <br />P;'V"n;'fi~d in #~ r'fhtnJP <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br /> <br />!?nt""rll F M"""'U1; P r <br /> <br />AnnRF<::~ anti PHONF <br />71fl U"in,<::h-ppt.rnno,.,rity, ('nRf71l (71~P7'i.7Hl <br />-L:o"'mllnnt~ Tn... (?M) P6-'JN!fl <br />fin? Pnrlr P"inl llriw '<::uifp 775.r;,,/rIPn rn Rfl4fl1 <br /> <br />NAMF <br /> <br />Urwri",..e. WlVld Wntp,.. <br /> <br />&. Li'lt any fuasibility studies or other investigations that have been completed or are now in progress <br />ror the proposed project. Please submit one copy of each completed study mth this application _ <br /> <br />9. Estim..>too cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs;~ <br /> <br />Estimated Constructi~n Costs; $ <br /> <br />Eaimated Total Costs: $ nO 000 00 <br />, <br /> <br />10. Loan amount and tenns you are requesting. <br />Requested Loan Amount; $ <;4,QQOilO, <br /> <br />(Usually 75% ofF-stinwled To<aI Cools) <br />y""'" (Usually 10,20, or 30 =) <br /> <br />Term (length) of loan: <br />Interest Rate: <br /> <br />.0 <br />.7<; <br /> <br />oft. (please call tor our current rates) <br /> <br />Part C. . Project Sponsor Financial Infonnation <br />BeC'~llse the CWCB ConstructioD. Fund is a revolving fund, it is important that the project sponsor <br /> <br />3 <br /> <br />Cfl.A9()Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.