My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153719 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153719 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:31:50 AM
Creation date
10/5/2006 11:35:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153719
Contractor Name
Johnstown, Town of
Contract Type
Loan
Water District
13
County
Larimer
Weld
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 <br />Town of Johnstown <br />Raw Water Pipeline and Pumpstation <br />Estimated TDtaI Project Cost <br /> <br />Item <br /> <br />Raw Water Pipeline Construction (Hall-Irwin) <br /> <br />Raw Water Pumpstation Construction (BT Construction) <br /> <br />Raw Water Pipeline and Pumpstation Change Orders (BT & Hall-Irwin) <br /> <br />Construction Phase Geotechnical Inspection Services (Maxim) <br /> <br />Resident Project Representative (PRe) <br /> <br />Property Ownership/Pipeline Alignment Study (Westearch) <br /> <br />Raw Water Pipeline Feasibility Study (PRe) <br /> <br />Raw Water Pipeline Design (PRe) <br /> <br />Raw Water Pipeline Additional Services (Geotecl111ical Report, Easement <br />Preparation; Empire Labs, TST) <br /> <br />Raw Water Pipeline Easements (Various) <br /> <br />Raw Water Pipeline Permits/Crossing Fees (Various) <br /> <br />Raw Water Pipeline Electrical Work (Poudre Valley REA) <br /> <br />Raw Water Pipeline Controls Programming (ESe) <br /> <br />Total <br /> <br />'Estimated cost; final cost to be determined at the completion of the project <br /> <br />2Estimated cost; insufficient data to determine actual cost <br /> <br />10 <br /> <br />Cost <br />$1,695,322 <br />$ 448,000 <br />$ 50,000' <br />$ 6,000' <br />$ 75,000' <br />$ 2,840' <br />$ 3,20Q2 <br />$ 200,000 <br />$ 15,500' <br />$ 60,000' <br />$ 2,500' <br />$ 31,299' <br />$ 9 .500' <br />$2,599,161" <br />
The URL can be used to link to this page
Your browser does not support the video tag.