Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 <br />Town of Johnstown <br />Raw Water Pipeline and Pumpstation <br />Estimated TDtaI Project Cost <br /> <br />Item <br /> <br />Raw Water Pipeline Construction (Hall-Irwin) <br /> <br />Raw Water Pumpstation Construction (BT Construction) <br /> <br />Raw Water Pipeline and Pumpstation Change Orders (BT & Hall-Irwin) <br /> <br />Construction Phase Geotechnical Inspection Services (Maxim) <br /> <br />Resident Project Representative (PRe) <br /> <br />Property Ownership/Pipeline Alignment Study (Westearch) <br /> <br />Raw Water Pipeline Feasibility Study (PRe) <br /> <br />Raw Water Pipeline Design (PRe) <br /> <br />Raw Water Pipeline Additional Services (Geotecl111ical Report, Easement <br />Preparation; Empire Labs, TST) <br /> <br />Raw Water Pipeline Easements (Various) <br /> <br />Raw Water Pipeline Permits/Crossing Fees (Various) <br /> <br />Raw Water Pipeline Electrical Work (Poudre Valley REA) <br /> <br />Raw Water Pipeline Controls Programming (ESe) <br /> <br />Total <br /> <br />'Estimated cost; final cost to be determined at the completion of the project <br /> <br />2Estimated cost; insufficient data to determine actual cost <br /> <br />10 <br /> <br />Cost <br />$1,695,322 <br />$ 448,000 <br />$ 50,000' <br />$ 6,000' <br />$ 75,000' <br />$ 2,840' <br />$ 3,20Q2 <br />$ 200,000 <br />$ 15,500' <br />$ 60,000' <br />$ 2,500' <br />$ 31,299' <br />$ 9 .500' <br />$2,599,161" <br />