My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00081
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:25:13 PM
Creation date
10/5/2006 11:34:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153691
Contractor Name
Lloyd Ranch Limited Partnership
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 91-1006
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER <br /> <br />I. <br /> <br />II. <br /> <br />III. <br /> <br />IV. <br /> <br />V. <br /> <br />TABLE QE CONTENTS <br /> <br />DESCRIPTION fAQK <br /> <br />GENERAL INFORMATION AND BACKGROUND <br /> <br />A. Introduction 1 <br />B. Description of Existing Reservoirs 2 <br />C. Requirements of the State Engineer 4 <br />D. Description of Drainage Area 6 <br />E. Climate 7 <br /> <br />ORGANIZATION AND FINANCIAL STATUS OF OWNER <br /> <br />A. History of the Organization 8 <br />B. Powers and Authority of Organization 8 <br />C. Financial status 9 <br /> <br />DESCRIPTION OF fROJECT LANDS <br /> <br />A. General Des~ription 11 <br />B. Land Ownersnip and Land Usage 12 <br /> <br />WATER REQUIREME~TS AND WATER SUPPLY <br /> <br />A. Water Requi~ements <br />B. Estimated Annual Water Supply <br />C. Water Right5 <br />D. Summary of ~ater Ava i lable <br />E. Water Quality of Reservoir Water <br /> <br />14 <br />15 <br />17 <br />19 <br />19 <br /> <br />PLAN OF DEVELOP~ENT <br /> <br />A. Background Information <br />AI. General Information 20 <br />A2. Hydrology Analysis (Inflow <br />Design Flood) 23 <br />B. Evaluation of Rapid Creek Reservoir <br />& Dam U <br />BI. Dam Embankment Evaluation & <br />Proposed Improvements 26 <br />B2. Emergency Spillway 29 <br />B3. Outlet Works 30 <br />B4. Instrumentation 32 <br />B5. Summary of Recommended Impvmts. 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.