My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00079
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:34:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0012X
Contractor Name
New Castle, Town of
Contract Type
Loan
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />11. <br />1 <br /> <br />2. <br /> <br />I <br />13. <br />14. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWN OF NEW CASTLE <br />W.T.P. CAPACITY (8-1-95) <br /> <br />(EQUATING FLOW TO EQR'S) <br /> <br />NOTE: THIS CALCULATION WILL DEFINE THE NUMBER OF EQR'S THAT THE TOWN <br />CAN SUPPORT WITH THE CURRENT CAPACITY OF THE WATER TREATMENT PLANT. <br /> <br />THIS CALCULATION IN FACT CONSIDERS THE IDEAL CAPACITY, ASSUMING A <br />LOW TURBIDITY IN EAST ELK CREEK (IE., JULY THROUGH MID MAY). <br /> <br />SKIP MARINO IS REPORTING THAT THE PLANT CAPACITY UNDER THIS SCENARIO IS 522 GPM. <br /> <br />DETERMINE THE NUMBER OF UNITS THAT THE TOWN CAN SUPPORT BASED UPON A CERTAIN CFS. <br /> <br />EQUATE FLOW RATE (CFS) TO GALLONS PER MINUTE (GPM) <br />(USE 60 SEC/MIN * 7.48 GALUCF FACTOR) <br /> <br />1.1631 CFS <br />521.9993 GPM <br /> <br />EQUATE GPM FLOW TO GALLONS PER DAY (GPD) <br />(USE 60 MIN/HR*24 HRlDAY FACTOR) <br /> <br />521.9993 GPM = <br /> <br />751679 GPD <br /> <br />FACTOR PEAK DAY SUMMER FLOW INTO AVERAGE DAY SUMMER FLOW: <br />(DIVIDE PEAK BY A FACTOR OF 1.5) <br /> <br />AVERAGE DAY SUMMER FLOW: 501119.3 GPD <br /> <br />EQUATE AVERAGE DAY SUMMER FLOW TO EQR'S (EQUIVALENT FLOW UNITS): <br />(THIS ASSUMES AN EQR IS 523 GPD-VERIFIED BY COMPUTATIONS LATER) <br /> <br />NUMBER OF EQR'S SUPPORTED BY FLOW: 958.1631 UNITS <br /> <br />PLANT CAPACITY UNDER IDEAL CONDmONS= 958 EQR'S <br />
The URL can be used to link to this page
Your browser does not support the video tag.