Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE III <br />ESTIMATED CONCRETE TEMPERATURES FOR <br />BLUEBIRD DAM <br />(REHABILITATED CROSS SECTION) <br /> <br /> Minimum Temp. FO 0 <br /> Mean Temp. F <br />Elevation (January 22) June 14 <br />10978* 26.3 46.6 <br />10969 26.7 43.8 <br />10959 27.0 42.4 <br />10949 27.8 42.4 <br />10939 28.3 41.6 <br /> <br />*Elevation of Spillway Invert; Crest @ 10979 feet <br /> <br />-18- <br />