My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00072
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:34:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153592
Contractor Name
West Divide Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br /> <br />6.1 Cost of Construction: <br /> <br />CHAfTER 6 <br />ESTIMATED COSTS <br /> <br />Construction costs have been developed by calculating estimated quantities <br /> <br /> <br />of material and applying unit prices to the quantity. Unit prices have been <br /> <br /> <br />based on actual bids on other recently completed dams in the area. Table 6.1 <br /> <br /> <br />summarizes quantities and costs of the Alsbury Project. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ITEM <br /> <br /> <br />Move in / Move Out <br /> <br /> <br />Stripping <br /> <br /> <br />Core Trench Excavation <br /> <br /> <br />Transport & Place Embankment <br /> <br /> <br />Embankment Compaction <br /> <br /> <br />Gravel/Sand Filter Material <br /> <br /> <br />Under Drain Pipe <br /> <br /> <br />Riprap <br /> <br /> <br />Bedding for Riprap <br /> <br /> <br />Outlet Works <br /> <br /> <br />Outlet Works Concrete <br /> <br /> <br />Gate & Operating Stem <br /> <br /> <br />Spillway <br /> <br /> <br />Crack Seal <br /> <br /> <br />Road Relocation <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />TABLE 6.1 <br />COST ESTIMATE <br /> <br />QUANTITY UNIT PRICE <br />Lump Sum $ -0- <br />2500 CY 1. 00 <br />400 CY 2.00 <br />13,000 CY 1.40 <br />11,800 CY .50 <br />100 CY 30.00 <br />400 LF 4.00 <br />800 CY 10.00 <br />400 CY 15 . 00 <br />150 LF 25.00 <br />3 CY 300.00 <br />Lump Sum -0- <br />250 CY 5.00 <br />Lump Sum -0- <br />Lump Sum -0- <br />ESTIMATED COST: <br />Contingencies (+20%): <br />Engineering: <br />TOTAL ESTIMATED COST: <br /> <br />-20- <br /> <br />$ <br />(Say <br /> <br />$ <br /> <br /> COST <br />$ 1,000 <br /> 2,500 <br /> 800 <br /> 18,200 <br /> 5,900 <br /> 3.000 <br /> 1,600 <br /> 8,000 <br /> 6,000 <br /> 3,250 <br /> 900 <br /> 1,000 <br /> 1,250 <br /> 800 <br /> 1,000 <br /> 55,200 <br /> ~ <br /> 11,040 <br /> 8,000 <br /> 74,240 <br /> $75,000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.