My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150088 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150088 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:56 AM
Creation date
10/5/2006 11:33:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150088
Contractor Name
Appleton Northwest (ML369) Lateral and Drainage Corporation
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />Water Right: 5 <br /> <br />CFS. <br /> <br />Average water diverted per year: <br /> <br />acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary~ YES <br /> <br />NO~ <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Louis Hartbauer NRCS. Grand Junction. CO 970-242-4511 <br />Crossroads Prof. BId!!:. 2754 ComDass Drive. STE 170 Grand Junction. CO 81506-8795 <br /> <br />Nathan Keever. Attornev 744 Horizon Ct. Grand Junction. CO 81506 970-241-5500 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br />Enl!ineerin!!: in PJ"Ol!RSS bv NRCS. to be completed bv 12/1101. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs:$ Provided bv NRCS <br /> <br />Estimated Construction Costs: $248.633.72 <br /> <br />Estimated Total Costs: $248.633.72 <br /> <br />10. Loan amount and tenns you are requesting. <br /> <br />Requested Loan Amount: $87.033 (Usually 75% of Estimated Total Costs) <br /> <br /> <br />Tenn (length) ofloan: 30 vears(Usually 10. 20, or 30 years) <br /> <br />Interest Rate: 4 % (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br />reports, fmancial statements, corporate reports or other current documentation of financial condition <br />and operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.