Laserfiche WebLink
<br />9999 GR <br /> <br />4 IRRIGATION WATER CONVEYANCE. PIPELINE HIGH PRESSURE UNDERGROUND 1430-00\ <br /> Concrete, Formed & <br />4a Reinforced 8.0 CY $503.11 CRBSC 65.0% $2,616 <br />4b Pioe, Concrete 150.0 DilFl $2.05 CRBSC 65.0% $200 <br /> Pipe, Plastic Irr. <br />4c :>=80DSt, <= 12" 21,000.0 Di/Ft $0.79 CRBSC 65.0',," $10,784 <br /> ROGk, Gravel Filler <br />4d Material 20.0 CY $12.75 CRBSC 65.0% $166 <br /> Structural Mild Steel <br />4e Fabrication 10.0 So.Fl. $23.47 CRBSC 65.0% $153 <br />41 .0 0.0% $0 $0 $0 $0 $0 <br /> <br />ITotal Cost-Share by Calendar Year <br /> <br />1$161,723\ <br /> <br />$0 I <br /> <br />$0 I <br /> <br />$0 I <br /> <br />$0 I <br /> <br />ITotal Contract Cost-Share <br /> <br />$161.7231 <br /> <br />8123101 <br /> <br />contract Number: Basin01-1 <br /> <br />Page 2 01 3 <br />