Laserfiche WebLink
<br />, <br /> <br />8.0 GROUND WATER <br /> <br />The Consultant wiIl review available data and published repons available from the USGS and <br />Colorado State Engineer's office to estimate the quantity of ground water (and, if available, its <br />quality) that might be developed in the alluvial deposits and the underlying bedrock fonnations in the <br />S. Boulder Creek and Coal Creek watersheds. Only those fonnations o.r with an estimated <br />potential yield from individual wells of more than 350 gallons <br />potentially feasible element. The analysis wiIl also sess the. ibutary on non- <br />tributary status of these aquifers. <br /> <br />9.0 REPORT <br /> <br /> <br /> <br />Interim technical memoranda will be pro Ided each month. Three copies of a draft report wilI be <br />provided to the City for its review. Comments from the City will be incorporated into the Final <br />Report and an original with ten copies and appropriate maps, exhibits, tables, computer data disks, <br />CADD disks, etc. will be provided to the City. A technical memorandum with instructions for <br />operating the computer model and specifying various options will also be provided along with four <br />hours of in-house training. A phased approach will be detailed in the Consultant's Work Plan, along <br />with a schedule for transmitting routine update repons to the City. <br /> <br />10.0 SCHEDULE <br /> <br />After notice to proceed, it is envisioned that a one month period will be required to reach the first <br />milestone meeting. After agreement on the design drought condition, an additional three months will <br />be necessary to complete the study as shown on the attached schedule. The technical project team <br />will be comprised of staff available at contract execution. It will be drawn from the following staff: <br /> <br />Noel Hobbs, P.E. - Project Manager <br />Joe Stibrich, P.E. - Project Engineer <br />Tom Charles, P.E. - Water Resources Engineer V <br />Lisa Buchanan - Water Resources Engineer IV <br />Jenny Braus - Water Resources Engineer II <br /> <br />A-7 <br /> <br />l\l16\ce_a.TXT <br />01\"'91 aUh <br /> <br />;.:.." <br />