Laserfiche WebLink
<br />., <br /> <br />. <br />, <br /> <br />. <br /> <br />CONTRACTOR: Alamosa River Watershed <br />Restoration Foundation. Inc. <br />Contract No. C150037 <br />Contract Amount: $450,000 <br /> <br />Agency Name: Water Conservation Board <br />Agency Number PDA/l'i {) ^4- /Jl1:J 3 ? <br />Routing Number LCX r.j). <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 19th day of October 2001, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board, hereinafter referred to as the CWCB and/or STATE, and the Alamosa <br />River Watershed Restoration Foundation, Inc., a Colorado nonprofit corporation, 15 Spruce <br />Street, La Jara, Colorado 81140, hereinafter referred to as the CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment as follows: Fund Number 424, Organization YYYY, Appropriation Code ALJ, GBL <br />A037, Program WTRC, Object Code 5180, Reporting Category 0037, Contract <br />Encumbrance No. C150037 <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. CWCB's authority for making this nonreimbursable expenditure: Section 37-60- <br />121 (1 )(b )(IV), C.R.S., authorizes the CWCS to make nonreimbursable expenditures from <br />the CWCS Construction Fund with specific authorization from the General Assembly. <br /> <br />4. The Project Summary, attached as Appendix 1 and incorporated herein, contains <br />Contractor Information (Section 1) and Project Description (Section 2). <br /> <br />5. Board approval and legislative approval, if required <br /> <br />a. At its January 2000 meeting, the CWCS approved a nonreimbursable expenditure for <br />the PROJECT to the CONTRACTOR in an amount up to $300,000. At its January 2001 <br />meeting, the CWCB approved an additional nonreimbursable expenditure for the <br />PROJECT to the CONTRACTOR in an amount up to $150,000. <br /> <br />b. Pursuant to H.B. 00-1419, Section 8, as amended by S.B. 01-157, Section 23, the <br />General Assembly authorized the CWCB to allocate $300,000 to the CONTRACTOR for <br />engineering and construction costs associated with implementation of the Alamosa <br />River Watershed Restoration Project. Pursuant to S.S. 01-157, Section 16, the General <br />Assembly authorized the CWCB to allocate an additional $150,000 to the CONTRACTOR <br />for PROJECT costs. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants contained <br />herein, the parties agree as follows: <br /> <br />A. Performance of PROJECT. The CONTRACTOR shall implement the PROJECT' as outlined in <br />"The Conceptual Design for the Alamosa River" (Dave Rosgen, 1999) in accordance with <br />the Scope of Work and the specific Project design attached as Appendix 2 and <br /> <br />Page 1 of 7 <br />