Laserfiche WebLink
<br />',. <br />~ <br /> <br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />o <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 8020.1 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />'( <br />., <br />,,\ <br />V ' <br />- 'i'V.v <br />,r \. ti <br />l L<i ~' <br />f. ,v <br />\(j <br />r: <br /> <br />c" \1: <br />, . <br />.\i? <br />,..;>0 f" :'0 <br />l..i ~ ',' , <br />U ~;\;,.' <br />,. <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />Ken Salazar <br />Executive Director, DNR <br /> <br />TO: <br /> <br />Dories C. LiIe. P.E. <br />DirectOr. CWCB <br /> <br />Members, CWCB <br /> <br />FROM: John Van Sciver <br /> <br />DATE: January 11, 1994 <br /> <br />SUBJECT: Agenda Item 7a(11), January 19, 1994, Board Meeting-- <br />Santa Maria Reservoir Company, RE: Continental Reservoir. <br />Request for Feasibility Study Grant and Request for One Year Deferral of <br />Existing Loan Payment. <br /> <br />BACKGROUND <br /> <br />. , <br /> <br />In 1989 a geomembrane liner was installed on portions of the upstream face and left <br />abutment area of the Continental dam to control seepage. The CWCB loaned $510,000 to <br />the Company, $257,000 of which was used to complete'the Continental repair. <br />When the reservoir was eventually filled in 1993, seepage again emerged on the <br />downstream face and left abutment area of the dam in an amount and location similar to <br />conditions which existed prior to the 1989 repair. As a result, and for the same safety <br />reasons, the State Engineer's Office reimposed the storage restriction. <br />The Company hired Harza, Consulting Engineers, to reevaluate the seepage <br />condition. Harza has recommended additional feasibility study work at a cost of $48,500.00 <br />I.. -I-"'I..~ J'. <br />~ l""r',.-^ ''7 '''''' \ \.;.. <br /> <br />DISCUSSION / ~<-. '; 1"\..t.-Z3~ "II'" .,' <br /> <br />,I"~ ~~"' m,,,, <h, ro"~i"g "q""'" 0;~"':: - <br /> <br />1. A Grb,:::~~~O~{~:,tJ:e ,F:f>>i,?!,I}tY, ,~Judl0~~st/~~~ut (:;~:750). <br /> <br />2. A Loan for 50%f)fe:..reasibility Study cost (about ~?i,250). <br /> <br />3. A one year Deferral of the scheduled $33,175.48 payment on the current loan, or <br />1/2 the feaSibilitbstu. dy cost, whichever is less. <br />., .t.:- <br />o ~ <br />tp.& <br /> <br />II <br />\. <br />L <br />\ \~ <br />\ "; <br />\' 1ft <br />, 1 ~ ~ <br /> <br />Q <br />V t~~t . <br />