<br />. ,; <br />.' ,', ;" <br /> <br />-) <br /> <br />EXHIBIT D <br /> <br />,> <br /> <br />.' <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRk~ PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering fim. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approval of bidding for the project. .Board <br />staff present at bid opening for construction. <br /> <br />5. Proj ect sponsor may issue the not ice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. <br /> <br />Conduct a Dre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />Construction commences. The Board staff makes oeriodic <br />inspections during construct.ion. All change orde:'s must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />S. The eonsulting eng ineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />7. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and filing. <br /> <br />EXHIBIT D <br />(Schedule A) <br /> <br />102 <br />schedj a <br />