Laserfiche WebLink
<br />I: .' <br />J <br />I <br />J <br />I <br />J <br />J <br />J <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-. <br />I <br /> <br />. <br /> <br />EXHIBIT A <br />- <br />FEASIBILITY REPORT CONTRACT <br /> <br />HYDRO-TRIAD, LTD. STANDJ,RD RATE SCHEDULE <br /> <br />" <br /> <br />The following hourly rate schedule fal" Hydl"o-Triad, Ltd. persollnel providing <br />engineering services on general and speci fic projects will be utilized on actual <br />time spent for each project activity. Dire~ costs attributable to a specific <br />project wi11 be billed to the cHent at cost plus 10 percent for Hydro-Triad, <br />Ltd. <br /> <br />TECHNICAL CLASSIFICATION <br /> <br />BILLING RATE <br />s 75.00 <br />65.00 <br /> <br />Pri ncilla 1 <br /> <br />Project Manager <br /> <br />Geological/Geo-Hydrologist Consultant <br />Projec~ Engineer <br />Geologist/Geo-Hydrologist <br />Engi neer <br />Junior Engineer/Designer <br /> <br />70.00 <br />52.50 <br />42.50 <br />40.00 <br />35.00 <br />29.00 <br />24.50 <br />24.00 <br /> <br />Engineering Technician I <br /> <br />Engineering Technician II <br /> <br />Technical Typist-Word Processing, <br />Administrative Support <br /> <br />Technical Typist <br /> <br />CClllIputer System (CPU Timel <br /> <br />Mileage: Compa~ Vehicles - Standard <br />- 4-Wheel Drive <br /> <br />21.00 <br /> <br />. <br /> <br />0.12/second <br /> <br />.ZUIli1 e <br />.40/mil e <br /> <br />Rental Vehicles <br /> <br />At cost -+- 1~ <br /> <br />Per Di em <br /> <br />S 50.00 or cost <br /> <br />Xerox Reproduction 8~ xlI" <br />Blueprint <br /> <br />0.15/copy <br />0.20/ft2 <br />Z.75/ftZ <br />Z.15/ft2 <br /> <br />Myl a r <br /> <br />Sepia <br /> <br />Effect1ve January 1. <br /> <br />196/, f{1] I oe aaJustea yearly on January 1. <br /> <br />EXHIBIT A <br />FEASIBILITY REPORT CONTRACT <br /> <br />~ <br /> <br />(}uf! <br />