My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00063
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153533
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />EXHI!lIT A <br />FEASIBILITY REPORT CON <br /> <br /> <br />AGREEMENT FOR ENGINEERING <br /> <br />This Agreement, made this ~ day of July, 1987, by and <br />between THE SANTA MARIA RESERVOIR COMPANY, a Colorado <br />corporation, hereinafter referred to as the "OWNER" and HYDRO- <br />~AD, LTD., a Colorado Corpcration, hereinafter referred to as <br />the "ENGINEER". <br /> <br />The OWNER intends to evaluate and determine a technical and <br />economically feasible method of controlling or eliminating the <br />seepage at Santa Haria and Continental Dams such that the cur- <br />rent storage hold orders may be removed. This will enable <br />storage to the full decreed storage for both Dams, an increase <br />of nearly. 20,000 acre-feet. This feasibility study may be paid <br />for in part with financial assistance from the Sta~e of Colorado <br />acting through the Colorado Water Conservation Boardr herein- <br />after referred to as "CWCB". <br /> <br />The ENGINEER represents that it is a professional engineer- <br />ing firm with the experience and expertise to perform the fea- <br />sibility study in a satiSfactory and timely manner, and agrees <br />to perform all of the various professional engineering services <br />for the feasibility study. <br /> <br />NOW THEREFORE, in consideration of the mutual covenants and <br />promises hetween the parties hereto, it is expressly agreed as <br />follows: <br /> <br />SECTION A - ENGINEERING SERVICES <br /> <br />The ENGINEER shall fu-~ish engineering services as follows: <br /> <br />STUDY M!:THODOLOGY <br /> <br />The Santa Haria and Continental DaJIIS rehabilitation feasi- <br />bility study will consist of the following~ajor steps: <br /> <br />A. Data collection and coordination <br /> <br />The initial phase of the study will consist of the assembly <br />and review of available info=mation needed to adeauatelv assess <br />the project feasibility. This process will L~clude ~~e'follow- <br />ing activities: <br /> <br />1. Review of documents pertaining to the initial con- <br />struction and suhseauent modifications to the embank- <br />ment, outlet works, spillway and related structures. <br /> <br />EXEIBIT ]L _ <br />FEASIBILITY REPORT CONTRACT <br />-1- <br /> <br />-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.