Laserfiche WebLink
<br />. <br /> <br />EXHI!lIT A <br />FEASIBILITY REPORT CON <br /> <br /> <br />AGREEMENT FOR ENGINEERING <br /> <br />This Agreement, made this ~ day of July, 1987, by and <br />between THE SANTA MARIA RESERVOIR COMPANY, a Colorado <br />corporation, hereinafter referred to as the "OWNER" and HYDRO- <br />~AD, LTD., a Colorado Corpcration, hereinafter referred to as <br />the "ENGINEER". <br /> <br />The OWNER intends to evaluate and determine a technical and <br />economically feasible method of controlling or eliminating the <br />seepage at Santa Haria and Continental Dams such that the cur- <br />rent storage hold orders may be removed. This will enable <br />storage to the full decreed storage for both Dams, an increase <br />of nearly. 20,000 acre-feet. This feasibility study may be paid <br />for in part with financial assistance from the Sta~e of Colorado <br />acting through the Colorado Water Conservation Boardr herein- <br />after referred to as "CWCB". <br /> <br />The ENGINEER represents that it is a professional engineer- <br />ing firm with the experience and expertise to perform the fea- <br />sibility study in a satiSfactory and timely manner, and agrees <br />to perform all of the various professional engineering services <br />for the feasibility study. <br /> <br />NOW THEREFORE, in consideration of the mutual covenants and <br />promises hetween the parties hereto, it is expressly agreed as <br />follows: <br /> <br />SECTION A - ENGINEERING SERVICES <br /> <br />The ENGINEER shall fu-~ish engineering services as follows: <br /> <br />STUDY M!:THODOLOGY <br /> <br />The Santa Haria and Continental DaJIIS rehabilitation feasi- <br />bility study will consist of the following~ajor steps: <br /> <br />A. Data collection and coordination <br /> <br />The initial phase of the study will consist of the assembly <br />and review of available info=mation needed to adeauatelv assess <br />the project feasibility. This process will L~clude ~~e'follow- <br />ing activities: <br /> <br />1. Review of documents pertaining to the initial con- <br />struction and suhseauent modifications to the embank- <br />ment, outlet works, spillway and related structures. <br /> <br />EXEIBIT ]L _ <br />FEASIBILITY REPORT CONTRACT <br />-1- <br /> <br />-- <br />