My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00061
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:33:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153366
Contractor Name
Ridges Metropolitan District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br />I <br />I <br /> <br /> TABLE 4-b <br />WATER PRODUCTION ANALYSIS <br /> Consumption <br /> Production (Ac. -Ft. /Day) <br />Month (Ac.-Ft./Day) Aver. Max. <br />May 5.23 2.33 3.70 <br />June 5.23 4.78 7.59* <br />July 5.23 5.23 8.32* <br />August 5.23 4.36 6.93* <br />September 5.23 4.03 6.41* <br />October 5.23 2.20 3.50 <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />*Maximum consumption will require drawing down of storage reservoirs <br />during peak periods. Increased consumption due to increase in users <br />will necessitate increasing pump capacities as planned. <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />IV - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.