My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00061
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:33:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153366
Contractor Name
Ridges Metropolitan District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />CHAPTER <br /> <br />TITLE <br /> <br />I <br /> <br />I <br />II <br />III <br />IV <br />V <br />VI <br />VII <br />VIII <br /> <br />General Information <br /> <br />The District <br /> <br />I <br /> <br />Land <br /> <br />Water <br /> <br />I <br /> <br />Plan of Development <br />Estimated Costs <br /> <br />I <br /> <br />Project Evaluation <br />Financial Program <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />TABLES <br />2-a <br /> <br />Value of Physical Assets <br />Conceptual Plan for Capital Improvements <br />Projected Design Flows <br />Water Usage <br />Development Plan <br />Schedule of Units <br />Colorado River @ Grand Junction Discharge <br />Per Water Year <br />Water Production Analysis <br />Water Quality Data - Colorado River <br />Special Losses of Head in Terms of V2/2g <br />Inflow Design Flood Computational Procedure <br />Ridges Metropolitan District Irrigation <br />Water System - Estimate Summary <br />Construction Cost Estimate <br /> <br />TITLE <br /> <br />2-b <br /> <br />I <br /> <br />2-c <br /> <br />2-d <br /> <br />I <br /> <br />3-a <br /> <br />I <br /> <br />3-b <br />4-a <br /> <br />I <br /> <br />4-b <br />4-c <br />5-a <br /> <br />I <br /> <br />5-b <br /> <br />6-a <br /> <br />I <br /> <br />6-b <br />6-c <br />6-d <br /> <br />Operation, Maintenance & Replacement Costs <br />Financial Program and Repayment Schedule <br /> <br />Construction Cost Estimates <br /> <br />I <br /> <br />8-a <br /> <br />I <br /> <br />I <br /> <br />PAGE <br />II-7 <br />II-7 <br />II-9 <br />II-9 <br />III-3 <br />1II-3 <br /> <br />IV-4 <br />IV-5 <br />IV-6/IV-8 <br />V-5 <br />V-6/V-7 <br /> <br />VI-2 <br />VI-3/VI-5 <br />VI-6 <br />VI-7 <br />VIII-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.