Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 10<1. <br />January 24, 1996 <br /> <br />3. That loan approval shall be contingent upon completion of the feasibility study, <br />and upon all standard contracting provisions of the CWCB, as determined by the <br />CWCB Director, and <br /> <br />4. That security for the loan shall be a collateral interest in the stream of income <br />derived by The Water Enterprise for The Town of Lyons. <br /> <br />4O(fl?~ <br /> <br />'Wu <br />~%U <br />Jt~ rv k <br /> <br />~$ <br />,,~tI <br /> <br /> <br />, <br /> <br />rr0u ~ ~ <br />~~~Iv~~ <br />~i~~ <br />(IJ <br /> <br /> <br /> <br /> <br />AaachmenIS <br />1. eweR Memorandum November 6-7,1995 (Updated 11/21/95) <br />2. CWCB t.c:tter 10 Town of Lyons. dated 11122195 <br />3. Town of LYOns, Ballot Resolution No. 1995-9. nn/95 <br />4. Town of Lyons Leaer (Collateral), dated 1/5196 <br />5. Draft Feasibility Study, RBD Inc.. January 1996 <br /> <br />C:\wp51\PROJ.NEW\lOd.Jan <br /> <br />3 <br /> <br />j <br />