Laserfiche WebLink
<br />Pre-Sed floor slope: <br />Sluiceway floor slope <br /> <br />2% <br />5% <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LYONS DIVERSION DAM <br /> <br />Desi!!n Criteria <br /> <br />Flow Range past headworks: <br />Diversion capacity (max): <br />Pre-Sed velocity: <br />Pre-Sed sluicing velocity: <br />Pre-Sed Sluicing flow rate: <br /> <br />0.2 - 2120 cfs <br />5 cfs <br />'::;'0.5 fps <br />2.4 fps <br />6 cfs <br /> <br />Sluicing Velocity transverse to headgates: 4 fps <br />Velocity thru headgates (min): 3 fps <br /> <br />Trashrack/Headwall losses: <br /> <br />0.2' <br /> <br />Desi!!n Elevations (relative to survey results) <br /> <br />Diversion Dam Low Flow crest elevation: set at 95.50 (invert of Trapezoidal Flume) <br />Operating Crest Elevation: 96.00 <br /> <br />Head!!ate sill: <br />Rq'd. gross opening: 5 cfs/3 fps = 1.67 sf <br />For (2) 2' wide headgates, opening depth = 0.42' (Fr = 0.82 - ok) <br />Headgate sill elev. = 95.50 - 0.2 - 0.42 = 94.88 <br /> <br />Trashrack sill: <br />T-R El. = Headgate sill elev. - 0.88' = 94.88 - 0.88 = 94.00 <br /> <br />Sluice Gate sill: <br />S-G El. = Trashrack sill elev. - sluiceway floor length x slope = <br />SIuicegate sill elev. = 94.00 - (12 x 0.05) = 93.40 <br /> <br />Pre-Sed Channel [(2) x 3' wide]: <br />Flow area = Q/V = 5/0.5 = 10 sf <br />Flow Depth = 10 sf 1 6'total width = 1.67' <br />Floor Elevation (upstream) = div. pool elev. - losses - channel flow depth <br />Upstream floor e1ev. = 95.5 - 0.2 - 1.67 = 93.6 <br />Floor Elevation (downstream) = upstream floor elcv. - channel length x slope <br />Downstream floor elev. = 93.6 - (50 x 0.02) = 92.6 <br />Sluice hopper invert elev. (1.0' dia. pipe) = 92.6 - 1.0 = 91.6 <br />