My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153808 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153808 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:50:16 PM
Creation date
10/5/2006 11:33:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153808
Contractor Name
Arkansas Groundwater Users Association
Contract Type
Loan
Water District
14
County
Pueblo
Bill Number
ARA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the headgate and augmentation station. No O&M costs will be required for the ditch, as the ditch can <br />be abandoned because the other one-quarter interest in the ditch has already been transferred. The <br />present worth cost of O&M, assuming a 40-year project life and three percent discount rate is about <br />$57,800. <br /> <br />The annual cost to lease 194 acre-feet of winter return flow water, assuming the source of leased water <br />is SECWCD reusable return flow water priced at $9.20 per acre-foot, is $1,784.80. The present worth <br />cost of leased winter return flow obligations, assuming a 40-year project life and three percent <br />discount rate, is about $41,300. <br /> <br />The total cost of purchasing a three-quarter interest in the Liston and Love Ditch is $1,502,000 and is <br />broken down as follows: <br /> <br /> Present Value <br />Purchase Price $1,287,900 <br />Annual O&M $57,800 <br />Augmentation Station $15,000 <br />Leased Winter Return Flow Wat~r $41,300 <br />Engineering and Legal Fees for Change of Use $100,000 <br />Total $1,502,000 <br /> <br />The total present worth cost per acre-foot of average augmentation replacement credit is $1,889 <br />($1,502,000/795 acre-feet). <br /> <br />D, Robinson Ditch <br /> <br />Mr. Robert Norris has notified AGUA of his intent to sell the entire Robinson Ditch for $800,000. The <br />Robinson Ditch has a decreed water right for 10.45 cis, Priority No. 13, on Fountain Creek, with an <br />appropriation date of March 1, 1863 and an adjudication date of February 15, 1882. The Robinson <br />Ditch diverts water from the west bank of Fountain Creek near the Midway Ranch in the northwest <br />one-quarter, northwest one-quarter of Section 14, -r ownship 17 South, Range 65 West of the 6th <br />Principal Meridian of EI Paso County, Colorado. <br /> <br />-32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.