My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153808 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153808 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:50:16 PM
Creation date
10/5/2006 11:33:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153808
Contractor Name
Arkansas Groundwater Users Association
Contract Type
Loan
Water District
14
County
Pueblo
Bill Number
ARA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CERTIF/CA TlON <br /> <br />I, Mark A. McLean, a Registered Professional Engineer in the State of Colorado, hereby certify that <br />the information presented in this report was prepared by Rocky Mo~~lm(ll.tJ~ants, Ine. under <br />my direct supervision for the owner thereof: ~ 1:)~~~.".~f!4~~ <br /> <br />~.~ <br /> <br />~\. ",4?#7 i~ I <br />.. .e 54; jIf <br />.. .. ~ ~ <br />(l's. ...........<:> # <br />SI0NAl~':;'~ <br />'lIIIWIlI.... <br /> <br />Mark A: McLean, P.E., #25061 <br /> <br /> <br />ACKNOWLEDGMENTS <br /> <br />Rocky Mountain Consultants, Ine. would like to thank the Board and staff of the Arkansas <br />Groundwater Users Association for their valuable assistance during the preparation of this report. <br />Special thanks to Mr. Dick Evans, President, and Ms. Jeanette Bryan, General Manager, for their <br />time and efforts on this project. We would also like to thank Mr. Bill Green of the Colorado Water <br />Conservation Board. <br /> <br />The following members of the Rocky Mountain Consultants, Inc. staff contributed to the study and <br />the preparation of this report. <br /> <br />Project Manager/Associate <br />Project Engineer/Associate <br />Principal <br /> <br />Mark McLean, P.E. <br />Mike Ballantine, P.E. <br />Dan Ault, P.E. <br /> <br />RMC Job No. 43.3177.002.00 <br /> <br />-,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.