Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply fucilities and descnbe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a mllp of the <br />service area. Same as for the first emergency loan from the CWCB <br /> <br />For existing fuci1ities indicate: <br />Number of shareholders lwo <br />Current Assessment per share $ 100.00_ <br />Number of acres irrigated 100,000 <br /> <br />or Nwnber of customers served 100 + <br />Number of shares 450 <br /> <br />Part B. - Description of the Project <br />I. Name of the project or fuci1ity Lararnie-Poudre Tunnel <br /> <br />2. Purpose of this loan application Check one. <br />New project <br />Rehabi1itation or replacement of existing fuci1ity <br />Enlargement of existing fuci1ity <br />Emergency Repair <br />Other (descnbe) <br /> <br />* <br /> <br />3. If the project is for rehabi1itation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? _ NO_ <br /> <br />4. General location of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown 60 miles west ofFt. Collins <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />fucilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />This loan will enable The Tunnel Water Company to complete the restoration ofparts of both the <br /> <br />east and west portions of the tunneL <br /> <br />Water Right: _300 <br /> <br />CFS. <br /> <br />Average water diverted per year: _15086_ acre-feet. <br /> <br />2 <br />