My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150052 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150052 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:57 AM
Creation date
10/5/2006 11:33:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150052
Contractor Name
Tunnel Water Company, The
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
EIA
Loan Projects - Doc Type
Feasability Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply fucilities and descnbe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a mllp of the <br />service area. Same as for the first emergency loan from the CWCB <br /> <br />For existing fuci1ities indicate: <br />Number of shareholders lwo <br />Current Assessment per share $ 100.00_ <br />Number of acres irrigated 100,000 <br /> <br />or Nwnber of customers served 100 + <br />Number of shares 450 <br /> <br />Part B. - Description of the Project <br />I. Name of the project or fuci1ity Lararnie-Poudre Tunnel <br /> <br />2. Purpose of this loan application Check one. <br />New project <br />Rehabi1itation or replacement of existing fuci1ity <br />Enlargement of existing fuci1ity <br />Emergency Repair <br />Other (descnbe) <br /> <br />* <br /> <br />3. If the project is for rehabi1itation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? _ NO_ <br /> <br />4. General location of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown 60 miles west ofFt. Collins <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />fucilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />This loan will enable The Tunnel Water Company to complete the restoration ofparts of both the <br /> <br />east and west portions of the tunneL <br /> <br />Water Right: _300 <br /> <br />CFS. <br /> <br />Average water diverted per year: _15086_ acre-feet. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.