Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Page 3, Question #5 <br /> <br />A 30" pipe will be installed in the ditch. The pipe will be cut into and anchored to <br />bedrock. The earth will be replaced over the pipe with a net laid over the earth and the <br />net will be pinned to the bedrock. <br /> <br />This should provide a permanent fix that will allow the Ditch Company to continue <br />utilizing their water rights to primarily irrigate hay meadows and water stock. <br />