My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00056
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:03 AM
Creation date
10/5/2006 11:33:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150041
Contractor Name
Woodchuck Ditch Company
Contract Type
Loan
Water District
58
County
Routt
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Advertisement for bids <br /> <br />The Upper Yampa Water Conservancy District is requesting separate sealed <br />bids for the construction of the Woodchuck Ditch Rehabilitation Project consisting <br />of the following: <br /> <br />1. 400 feet of 36" diam heavy wall pipe anchored with 'Yo" wire rope into <br />bedrock, <br />2, Excavation of approximately 8000 cy blasting into bedrock for pipe <br />replacement. <br />3. Installation of interceptor drains adjacent to pipe. <br />4. Excess excavated material to be placed on pipe, backfilled, and <br />compacted to restore approximate slope grade. <br /> <br />Construction is scheduled for late April and early May to permit ditch flows by the <br />last week in May. Access along the ditch to the site is from Game Trails <br />Subdivision Road, which intersects CR 129, opposite the airport. <br /> <br />Drawing and specifications are now available at the office of the Natural <br />Resources Conservation Service (NRCS), 1475 Pine Grove Road, Suite 201A, <br />Steamboat Springs. Copies may be obtained for a non-refundable deposit of $35 <br />made out to the Upper Yampa Water District. Bid security in the amount of 4% <br />must be submitted at bid opening. <br /> <br />A pre-construction meeting is scheduled at the site, weather and site conditions <br />permitting, at 1 :30 pm on Wednesday 29 March. Opening of sealed bids will be <br />held at the NRCS office at 1 :30 pm on Friday 7 April. <br /> <br />Upper Yampa Water Conservancy District <br /> <br />John R. Fetcher, Secretary <br /> <br />First publication: 8 March 2000 <br />Second Publication: 15 March 2000 <br />Last Publication: 22 March 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.