Laserfiche WebLink
<br />VIII-3 <br /> <br />Willow Creek. Rock Creek has a flow approximately five times greater than <br /> <br /> <br />Willow Creek, and therefore, can sustain the water needs of the Town of Fern- <br /> <br /> <br />cl iff. <br /> <br />As pointed out in Section IV, however, it will be necessary for Allenspark <br />to obtain senior irrigation water rights and transfer them to their municipal <br />operations. By necessity, this will require the transfer of water resources <br />from agricultural to municipal use. <br /> <br />The construction of the water project will not inundate or eliminate any pre- <br /> <br /> <br />sent wildlife habitat. The noise and confusion of construction will temporarily <br /> <br /> <br />disrupt some wildlife habitat in the area, but no long term effects are expected. <br /> <br />The construction activities will also have a temporary intrusion on the relatively <br /> <br /> <br />quiet and esthetic setting of the area. This intrusion will be kept at a mini- <br /> <br /> <br />mum since only proven and acceptable construction techniques will be employed. <br /> <br /> <br />This includes the appropriate erosion control measures, noise control, etc. <br />