My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00055
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 9:29:07 AM
Creation date
10/5/2006 11:33:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153015
Contractor Name
Allenspark Water and Sanitation District
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 75-468
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />SECTION VI <br />ESTIMATED PROJECT COSTS <br /> <br />CAPITAL COSTS <br />The estimates are based on 1974 cost levels, without a large allowance for <br />future dollar devaluation or inflation. The total represents project cost <br />estimates which include probable contract construction bids and an additional <br />25 percent allowance. This allowance can be broken down approximately as <br />follows: <br /> <br />Design Engineering <br />Surveys and Staking <br />Construction Inspection <br />Administrative - Overhead <br />Fiscal and Legal <br />Contingencies & Misc. <br /> <br />8.0% <br />I. 5% <br />2.0% <br />1.5% <br />2.0% <br />10.0% <br />25.0% <br /> <br />No costs are included for individual taps and service lines as it is assumed <br />that these will be privately installed and owned. <br /> <br />The preliminary cost estimates for the proposed initial project are given in <br />Table VI-A following. The estimate is based on project construction in early <br />1975. For this reason, no specific inflationary figure is given or projected <br />price increases. Subsequent planning estimates, if project funding is delayed <br />substantially, should be trended to reflect current cost levels. <br /> <br />The capital requirements do not include land acquisition costs within the Dis- <br />trict boundaries. Land and easements required will be obtained as outlined in <br />Section V. Individual service ines are to be paid for by each water customer. <br />The District mains are therefore, located to provide equitable service line lengths. <br />
The URL can be used to link to this page
Your browser does not support the video tag.