Laserfiche WebLink
<br />::0-.,\ <br />\<',J <br /> <br />.<-:\ <br />^':~ ) <br /> <br />IV. ENGINEERING COSTS <br /> <br />The following paragraphs set forth the assumptions and esti- <br /> <br />mated engineering costs by phase for this project. <br /> <br />Phase I: <br /> <br />Manpower Estimate - The manpower and engineering costs for <br /> <br />Phase I are set forth in the following Table. <br /> <br />Technical Category <br /> <br />Man-Hours <br /> <br />Personnel Costs <br /> <br />Direct Costs <br /> <br />Di rector 20.0 $1400.00 <br />P.M. 25.0 1500.00 <br />Geological Eng. 24.0 1680.00 <br />Engineer 36.0 1260.00 <br />Draft/Clerical 10.0 220.00 <br />Sub-Totals $6060.00 $350.00 <br /> <br />The estimated cost for phase I is $6410.00 <br /> <br />Phase II: <br /> <br />The estimated manpower for Phase II will be developed upon <br /> <br />completion of the Phase I work. The rnage of engineering costs for <br /> <br />IV-1 <br /> <br />'. <br />'>, '., ~. <br /> <br />'. <br />