My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00054
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />::0-.,\ <br />\<',J <br /> <br />.<-:\ <br />^':~ ) <br /> <br />IV. ENGINEERING COSTS <br /> <br />The following paragraphs set forth the assumptions and esti- <br /> <br />mated engineering costs by phase for this project. <br /> <br />Phase I: <br /> <br />Manpower Estimate - The manpower and engineering costs for <br /> <br />Phase I are set forth in the following Table. <br /> <br />Technical Category <br /> <br />Man-Hours <br /> <br />Personnel Costs <br /> <br />Direct Costs <br /> <br />Di rector 20.0 $1400.00 <br />P.M. 25.0 1500.00 <br />Geological Eng. 24.0 1680.00 <br />Engineer 36.0 1260.00 <br />Draft/Clerical 10.0 220.00 <br />Sub-Totals $6060.00 $350.00 <br /> <br />The estimated cost for phase I is $6410.00 <br /> <br />Phase II: <br /> <br />The estimated manpower for Phase II will be developed upon <br /> <br />completion of the Phase I work. The rnage of engineering costs for <br /> <br />IV-1 <br /> <br />'. <br />'>, '., ~. <br /> <br />'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.