My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153795 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153795 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:49:25 PM
Creation date
10/5/2006 11:33:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153795
Contractor Name
Farmers Independent Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />....;t. -~ <br /> <br />April _, 1998 <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and <br />Construction Section <br />1313 Sherman St., Room 721 <br />Denver, CO 80203 <br /> <br />RE: Feasibility Study <br />Farmers Independent Ditch <br /> <br />Dear Mr. Stanton, <br /> <br />I have read the Feasibility Study concerning the rehabilitation of the Farmers Independent Ditch. <br /> <br />o The Feasibility Study is acceptable as written. <br /> <br />o The Feasibility Study will be acceptable, if the following comments and corrections are <br />included: <br /> <br />Sincerely, <br /> <br />Mr. Frank Eckhardt Jr., President <br />Farmers Independent Ditch Co. <br /> <br />D:\ WPSl \Proj-New\FannerslndFSAprv <br />
The URL can be used to link to this page
Your browser does not support the video tag.