Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Institutional Considerations <br /> <br />Technical assistance is being provided by the Natural Resource <br />Conservation Service (NRCS). <br /> <br />The FlOC has been approved by the CWCB to borrow up to $55,000 <br />from the Construction Fund Small Project Loan Account. The loan <br />from the CWCB is contingent upon the successful negotiation of a <br />contract between the CWCB and FlOC. <br /> <br />Opinion of Feasibility <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep the FlOC from <br />successfully completing this project. <br /> <br />Feasibility Study <br />Farmers Independent Ditch Rehabilitation <br />October 1997 <br /> <br />8 <br /> <br />I <br />