My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153795 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153795 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:49:25 PM
Creation date
10/5/2006 11:33:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153795
Contractor Name
Farmers Independent Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />outlet structure. A trash rack will be installed at the upstream <br />end. The contractor will be responsible for removal and disposal <br />of the existing culverts. <br /> <br />Water Rights <br /> <br />The Farmers Independent Ditch has water rights in amount of 147 <br />CFS. There are 800 shares in Company stock, and 62 shareholders. <br />The Farmers Independent Ditch diverted a total of 16,742 acre <br />feet in 1994, and 13,304 acre feet in 1995, according to State <br />Engineer records. The S.E,O. diversion records are found in <br />Appendix C. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $48,000. Project planning <br />and engineering design will be provided by the NRCS at no cost to <br />the FIDC. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. . Engineering by NRCS <br />2. 480 feet of 42" Pipe; installed <br />3. Inlet and Outlet Structures <br />4. Trashrack <br />5. Misc. <br /> <br />$ 0 <br />$ 35,000 <br />$ 9,000 <br />$ 1,000 <br />$ 3.000 <br /> <br />Total <br /> <br />$ 48.000 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />Tarqet Completion Date <br />10/30/97 <br />11/10/97 <br />11/20/97 <br />12/10/97 <br />12/15/97 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a negative economic impact on the Company <br />during payback of the CWCB loan (see Financial Plan, below). <br /> <br />Feasibility Study <br />Farmers Independent Ditch Rehabilitation <br />October 1997 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.