Laserfiche WebLink
<br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 7 <br />Preliminary Cost Estimate <br />Alternative No 5 <br />50-yr. Levees Along Pawnee Creek, with <br />Cemetery Levee/Channel, Q100 = 1400 cfs <br /> <br />Item Unit Quantitiy Unit Cost Cost <br />1. General <br />Mobilization LS 1.0 $50,000 $50,000 <br />Traffic Control LS 1.0 $50,000 $50,000 <br />2. Channels <br />Clearing & Grubbing AC 10.0 $500 $5,000 <br />Remove and Replace Topsoil CY 16200.0 $2 $32,400 <br />Overflow chan. east of railroad to S. Platte Riv. CY 67100.0 $3 $201,300 <br />Channel south of CR 24 CY 5000.0 $3 $15,000 <br />Seeding and Revegetation AC 10.0 $3,500 $35,000 <br />3. Railroad Crossing <br />Box culvert at railroad LS 1.0 $150,000 $150,000 <br />4. Standard Levees (50-yr. west of US Hwy. 6) <br />Clearing & Grubbing AC 5.7 $500 $2,850 <br />Remove and Replace Topsoil CY 9200.0 $2 $18,400 <br />Earthwork for levee north of CR 24 CY 9500.0 $3 $28,500 <br />Riprap Slope Protection TN 6000.0 $30 $180,000 <br />Seeding and Revegetation AC 5.7 $3,500 $19,950 <br />Road Closure LS 1.0 $25,000 $25,000 <br />5. Ditch Crossing <br />Sterling NO.1 Ditch Crossing LS 1.0 $30,000 $30,000 <br />6. Ring Levees <br />#1 LS 1.0 $16,300 $16,300 <br />#2 LS 1.0 $9,400 $9,400 <br />#3 LS 1.0 $27,600 $27,600 <br />7. Culverts @ US Hwy. 6 <br />Remove Existing Roadway SY 150.0 $4 $600 <br />Install 4-8' x 20' RCS Culverts LF 80.0 $4,650 $372,000 <br />Erosion Cnotrol (Type H Riprap) TN 345.0 $35 $12,075 <br />Extend Existiong Siphon Structure LS 1.0 $20,000 $20,000 <br />8. Drop Structure <br />Concrete Cut-Off Wall LS 1.0 $35,000 $35,000 <br />Type M Riprap TN 105.0 $30 $3,150 <br />Type H Riprap TN 525.0 $30 $15,750 <br />9. Channel Improvements Downstream of UPRR <br />Concrete Flood Wall CY 190.0 $500 $95,000 <br />Excavation For Channel CY 9160.0 $3 $27,480 <br />Seeding and Revegetation AC 0.2 $3,499 $700 <br />Soil Cement under UPRR CY 750.0 $20 $15,000 <br />10. Springdale Ditch Improvements <br />60-inch RCP With Flap Gate LS 1.0 $17,500 $17,500 <br /> <br />Subtotal <br />15% Contingency <br /> <br />$1,510,955 <br />$226,643 <br /> <br />Subtotal Construction Cost <br /> <br />$1,737,598 <br /> <br />Engineering Costs (12%) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition (Channel & Levees) <br /> <br />26 <br /> <br />$208,512 <br />$86,880 <br />$65,000 <br /> <br />AC <br /> <br />2500.0 <br /> <br />Total Project Cost <br /> <br />$2,097,990 <br /> <br />26 <br />